METHA Aufbereitungsanlage / Hafenanlage

In Finkenwerder Vorhafen lies the METHA treatment plant wharfage, belonging to the Hamburg Port Authority. METHA is the first major sediment-processing plant in the world to mechanically process dredged harbour sediments. It separates and drains polluted silt from sand. The sand can be used as building material while the silt is processed and either used as packing material or deposited environmentally safely. Large scale tests have been conducted in view of recycling as a building material or a natural resource substitute in the production of building materials. Conduit pipes and suction devices transport the dredged material via the wharfage to the processing plant.

See at goole maps
Adress
Dradenauer Hauptdeich 17
21129 Hamburg
Contact
HPA Hamburg Port Authority
Ansprechpartner: Ulrich Döring oder Matthias Jürss
Alter Wandrahm 4
20457 Hamburg
040-428 47 72 32 oder 428 47 73 01
liamE
http://www.hamburg-port-authority.de/de/Seiten/Startseite.aspx
Public authorities:

Polizeikommissariat 47
Straßenverkehrsbehörde
Neugrabener Markt 3
21149 Hamburg
040-428 65 47-21/ -22/ -24
040-428 65 47-99
liamE

Bezirksamt Hamburg Harburg
Fachamt Management des öffentlichen Raumes, Sondernutzungen
Harburger Rathausplatz 4
21073 Hamburg
040 428 71 33 40
liamE
http://www.hamburg.de/bezirke/harburg
Subscribe to Newsletter
  • English Newsletter
Contact
Filmförderung Hamburg Schleswig-Holstein
Friedensallee 14-16
DE - 22765 Hamburg
Directions

Filmförderung Hamburg Schleswig-Holstein
Filmwerkstatt Kiel
Haßstr. 22
DE - 24103 Kiel
Directions

Contact our team
Social Media